Nanotechnology Project

Get the findNano iPhone application


Edison-Industrial Site

Site LocationEdison, NJ
Site TypeManufacturing Site
Start Datena
GeologyFractured bedrock, specifically Brunswick Shale. 4 to 6 feet of soil comprised of silt and clay over bedrock
Media TreatedFractured Bedrock
Contaminant TreatedTCA, TCE, DCA, DCE, chloroethane, vinyl chloride
Initial Contaminant ConcentrationMaximum TCA concentration: 37,000 mg/L; 10,000
Final Contaminant ConcentrationDecreased to a level below minimum detection limit; ethane concentration in well 1 steadily increased
Type of NanoparticlenZVI (OnMaterial's Z-loy)
Length of Operation13 months

Return to the Main Nanoremediation Map